ROBOTICS / ColdDock Commissioning

ColdDock · Commissioning

Six steps to bring a new robot online at a dock bay

Installing a robot at a new bay touches layout, cameras and safety. This six-step tablet wizard walks a deployment engineer from bay survey to a two-person sign-off.

Read Time: Full case study 5 min

Robotics

Operator UI

Cold Storage

Design System

Digital Twin

Client / Self-initiated concept

Industry / Cold Storage Robotics

Team / Solo

Platform / Tablet

Role / Product Designer

Tools / Figma, Blender, Claude

Timeline / Nov 2026

Framework / Design tokens, Light + Dark

Final design

A six-step commissioning wizard on the tablet, in Light and Dark

Commissioning on the tablet. Step 1, bay survey.
Step 3, camera calibration.
Step 6, two-person sign-off.
6
Steps
Survey, placement, calibration, safety, test unload, sign-off.
2
People To Sign Off
Engineer and site manager.
1
Device
A tablet carried at the bay.
2
Themes
Light and Dark.

THE PROBLEM

Commissioning is long and easy to get wrong. A skipped calibration or an unverified safety field doesn’t show up until the robot is running next to people.

MY ROLE

Product designer on a self-initiated concept. Designed all six steps of the tablet wizard in Light and Dark, and the progress-fill motion pattern used in the prototype.

RESEARCH

Bay measurements came from the scale-checked twin: 9 × 10 ft doors, 14 ft centers, 50 in dock height, 7 × 8 ft levelers. The survey step checks a real bay against those numbers before placement starts.

WHY THESE COLORS AND FONTS

Gray means normal, so color appears only when something needs attention (ISA-101 High-Performance HMI). Alarm colors follow Z535 safety signage, red, orange, yellow and blue, and each one pairs with a shape and a label so nothing relies on color alone. Inter carries interface text, and IBM Plex Mono carries live values so digits don't shift as they update. Dark is the default for the dock office and floor tablet; Light covers bright areas and print. Every text and state color clears WCAG AA 4.5:1 in both themes.

Step 4, safety field verification.

KEY FINDING

The order matters more than the screens.

Safety fields can’t be verified before the camera is calibrated, and a test unload means nothing before the fields are set.

CORE TENSION

Guidance against expertise. Engineers know the job and don’t want hand-holding. A missed step is still costly. The wizard had to stay out of the way and still enforce the order.

Step 5, test unload.

DESIGN DECISIONS

ONE STEP PER SCREEN

Each step fills the tablet, with a clear done state, so progress is obvious from across the bay.

Step 1, bay survey.

LOCKED ORDER

Later steps unlock only when earlier ones pass. The engineer can review any step, but not skip one.

Step 6, two-person sign-off.

TWO-PERSON SIGN-OFF

The last step needs both the deployment engineer and the site manager, so no one signs off alone.

OUTCOMES

A concept, not a shipped product, so there are no usage numbers. Here is what exists.

Commissioning Wizard

A six-step commissioning wizard for tablet in Light and Dark.

Clickable Prototype

A clickable prototype of all six steps.

Progress Motion Pattern

A progress motion pattern in the shared library.

Light and Dark Themes

Every screen built in light and dark themes, switchable in place.

WHAT I'D DO DIFFERENTLY

Time a real install. Knowing which step takes longest would show where the wizard should help most.